HUANENG Wind Power Storage Project
HUANENG Wind Power Storage Project

In the HUANENG Wind Power Storage Project, the wind farms in Mengcheng County completed wind power stations with a total installed capacity of 200MW. On August 27, 2020, the HUANENG Mengcheng Wind Power 40MW/40MWh energy storage project passed the grid-connection acceptance organized by State Grid Anhui Electric Power Co., Ltd. and was successfully put into operation. This energy storage project was allocated at 20% of the installed wind power capacity.
Xiaojian and Xuyong wind farms in Mengcheng County have completed wind power stations with a total installed capacity of 200MW.On August 27.2020,HUANENG Mengcheng Wind Power 40MW/40MWh energy storage project passed the grid-connection acceptance organized by State Grid Anhui Electric Power Co.,Ltd.,and was put into operation smoothly.The energy storage project is allocated according to 20% of the installed wind power capacity.